Western Canada Dilbit is a blend comprised of the streams formerlly transported as Sunrise Dilbit Blend (SDB), Hangingstone Dilbit Blend (HDB), and Leismer Corner Blend (LCB). This dilbit is produced using SAGD technology from the Athabasca region and transported to Enbridge's Edmonton Terminal for blending. WDB is not part of the Enbridge Pooling Program, however samples are taken at Superior, WI.
Batch: WDB-7001 --- Date: March 12, 2026 --- Sample Location: Superior
Western Canada Dilbit saw slightly increased TAN and metals for the March sample. The new light ends test recorded reduced pentanes and hexanes. Simulated distillation results showed a larger than usual residue fraction.
View data for the last six samples.
Use the checkboxes for each table below to select data and choose a date range to export a .CSV file containing the selected data groups. Use Excel, or other software, to view and manipulate the data for your purposes.
View a pdf document with summary data for the selected sample date.
Screen too narrow to display property chart. Try landscape view on mobile.